Referenzen_Seite
blockHeaderEditIcon

Client References

Referenz_01
blockHeaderEditIcon

Güntner


 

 

The user-friendly add-on is uncomplicated and speeds up the work process, which saves us time and money.

 

Istvan Schwarczenberger, Leiter ERP Team Güntner-Tata Kft., Ungarn

 

 

Referenzen_02
blockHeaderEditIcon

IT Maschinenbau Kitz


 

 

Daily progress control meetings have been abolished after the introduction of the ascon-planner. Previously there had been no reaction until the end of the process, thus there was usually nothing left to be salvaged from the orders. If so, then often only through mandatory overtime.


"The use of the ascon-planner has contributed significantly to mk's profit increase through its process optimisation". 

 

Peter Fiebig, Projektmanagement IT Maschinenbau Kitz GmbH

 

 

Referenz_2023_01
blockHeaderEditIcon
Referenz_2023_2
blockHeaderEditIcon
Referenz_L_01
blockHeaderEditIcon

Lenord + Bauer

Referenz_L_02
blockHeaderEditIcon

Buchi

Referenzen_L_03
blockHeaderEditIcon

Jungeblodt

Referenzen_04
blockHeaderEditIcon

Handtmann


 

 

"With the ascon-planner we have increased the internal delivery reliability of goods to stock from 60% to more than 90%, to substantially reduce the stock and WIP value, and significantly improved the adherence of our delivery dates to the customer". 

Klaus Mensch, Bereichsleiter Produktion

Albert Handtmann Armaturenfabrik GmbH & Co.KG

 

 

Referenzen_L_04
blockHeaderEditIcon

carthago DasReisemobil

Referenzen_L_05
blockHeaderEditIcon

Centa

Referenzen_05
blockHeaderEditIcon

Güntner Mexico


 

 

“ascon planner is giving us a compiled and organized 360° review of all the planning ERP relationships, it is helping us to maintain a controlled planning environment and it is visually preventing us for future problems that may arise.”

 

“ascon Planner has one of the best cost-benefit ratio of all the system tools that we have ever acquired.”
 

Rodrigo Velazquillo, Change Management,

Güntner de México, S.A. de C.V.

 

 

Referenzen_L_06
blockHeaderEditIcon

Knott

Referenz_2020_01
blockHeaderEditIcon
FBS
Referenzen_L_08
blockHeaderEditIcon

Mediseal

Referenz_L_09
blockHeaderEditIcon

Normbau


 

 

"We had introduced the ascon-planner in a very short time. 


With its ATP/CTP check we have increased our delivery reliability to the customer by almost 10 percentage points. 


The weekly discussion regarding missing components is now superfluous. The planner provides an excellent transparency to the sales, purchasing and production departments". 


Hans-Peter Streif, IT-Manager, Normbau GmbH

 

 

Refernez_10
blockHeaderEditIcon

NOBLEX


 

 

"Due to the turbo introduction of the ascon-APS the famous story of a missing part, which at the time of delivery receives a four, five or even six digit value, became a thing of the past after a short time.

MRP was realigned, synchronisation errors between the requirements and the receipts on all MRP levels were found and eliminated.

And the list of missing parts shrank from day to day." 

Roger Steiner, Geschäftsführer Produktion und Technik, Noblex GmbH  

 

 

Referenz_2020_06
blockHeaderEditIcon

Konvekta


 

 

"Due to the precise planning with the ascon-planner we have managed to harmonise the planning of production and material disposition.


Thus we have turned a backlog of the past into a lead time in the present. This means less stress internally, absolute adherence to schedules and therefore satisfied customers"   

 

Volker Hellriegel
Leitung Produktion und Disposition, Konvekta AG

 

 

 

Referenz_2020_03
blockHeaderEditIcon
OTT
Referenz_2020_04
blockHeaderEditIcon
Gräper
Referenz_2020_05
blockHeaderEditIcon
Keba
Referenz_2020_02
blockHeaderEditIcon
Luminator
Referenz_2023_3
blockHeaderEditIcon
Referenz_2023_4
blockHeaderEditIcon
Referenz_2023_5
blockHeaderEditIcon
Referenz_2023_6
blockHeaderEditIcon
Referenz_2023_7
blockHeaderEditIcon
Username:
User Login
Your Email
*